Projects

US Army Corps of Engineers—Fort Worth District

Evans Theater
Fort Sam Houston, TX

This project consists of providing all labor, material and equipment to renovate interior of Evans Theater to include the following: HVAC, repair/replace seating, bring electrical and lighting system up to current code and repair interior.

Staff Judge Advocate Building 13 Renovation
Fort Hood, TX

Remodel the existing facility to accommodate the Office of the Staff Judge Advocate: modify the interior layout to account for manpower, computers, network, printers, digital senders, fax machines, telephones and upgrade intercom/public address system.

back to top

US Army Corps of Engineers—Omaha District

Leadership Development Building
Buckley AFB, CO  
The Leadership Building at Buckley is a 16,000 sf multipurpose facility with seating capacity for 500 people. The building is used for instruction, meetings, and conferences. The exterior of the building was designed to blend and complement the existing architecture of the base. The building was constructed to be LEED Silver.

Sewer Utilities Upgrade
Fort Carson, CO

The project included total design and construction including boring beneath existing horizontal construction with significant vehicle and pedestrian traffic. The project needed to be extensively phased to minimize the impact to the base.

Building 368 Renovation
FE Warren AFB, WY

The project included total design and construction of the area for use by the members of the 15 MUNS. The base requirements for design and construction included the renovation of a work area and the creation of a Munitions Control room placed within a historical building. The integrity and character of the historical building was to be maintained throughout the project.

Penstocks in Tunnels 1-8
Fort Randall, SD

Prep and Paint Penstock Sections in Tunnels 1-8
90% Self Performed

Construct Water Line Under I-90
Ellsworth AFB, SD

The project consisted of boring a 54" steel casing that will carry a new 16" restrained joint PVC pipe. The project included valves, valve boxes, and other appurtenances at various locations. Also included in the project was removal and abandonment of existing water mains. The construction also included connecting to existing water mains, parking lot repair, fence removal and replacement, seeding and surface restoration.

Install HVAC Units in Dorms 130/131
Minot AFB, ND

Remove existing HVAC units. Upgrade to new, more energy efficient units with multiple zones to serve the needs of Dormitories 130/131.

back to top

National Renewable Energy Laboratory, Golden, CO

Thermal Energy Storage Test Facility—Steam Module, SolarTAC
Aurora, CO

Design, fabricate, and install a thermal energy storage test system to support the development, testing and evaluation of novel thermal energy storage materials and systems. Thermal energy will be supplied to candidate TES systems via an independent loop: as high-temperature, high-pressure steam. The systems will be able to thermally cycle a TES system under conditions that replicate a CSP power plant.

S&TF PDIL Gas Line Upgrade & SERF HPM Gas Line Upgrade
NREL Facility Golden, CO

Remove and replace toxic gas line systems including structural upgrades, Fire Detection/Alarm and Suppression, Hazardous Production Materials (HPM) Gas Delivery System, Monitor Detect Alarm System, Work included new acid and hydride monitoring points and tubing to existing MDA room, and new electrical and mechanical service to HPM controls system

Windfarm Turbine Pad
NREL Facility Boulder, CO  
Install new concrete pads and anchor bolts to support the installation of wind turbines with sizes varying from residential sizes to megawatt turbines.

Denver West Parkway Addition
Golden, CO

This project as part of the traffic mitigation measures added an additional right turn lane from Denver West Parkway onto Denver West Marriott Blvd. The result is increased out bound turn capacity from the South Table Mountain Campus traveling eastbound.

Detention Facilities

Phelps County Justice Center
Phelps County, NE 
Construction of a 31,000 square foot detention facility including commercial kitchen, offices, medical facility, and detaining areas; addition and remodel of the existing 1911 courthouse. The addition is constructed of Insulated Concrete Forms, masonry, and poured in place concrete with the requirement to match existing adjacent historical building’s architectural finishes. 

Bent County Detention Facility
Las Animas, CO

Bent County Detention facility includes a Jail, Sheriff's Department, Sheriff's Garage and Ambulance Garage.  First phase of building is designed for 38 inmates with expansion capacity of up to 68 inmates on a second tier.  The facility includes offices and garages for the Sheriff's department.

Teller County Jail
Divide, CO

Initially a 58-bed jail facility was expanded to 102-bed.  Could be further expanded.  The structure was built utilizing masonry, cast-in-place concrete, structural steel, and steel joist and deck.  The facility includes full service kitchen, laundry, offices, indoor/outdoor gymnasium, a library, and computer flooring in the dispatch area.

Gilpin County Justice Center
Gilpin County, CO

52,000 s.f. 58-bed detention facility expandable to 112-bed.  Includes full service kitchen, library, laundry, and indoor/outdoor exercise facility.  Justice Center includes courts, social services, District Attorney's offices and sheriff's facilities.

Prowers County Detention Facility/Sheriff Office
Lamar County, CO

New two story masonry facility and the renovation of an existing facility to become the new sheriff's office.  48-bed facility includes full service kitchen, laundry, crime labs, juvenile holding facility, and large indoor/outdoor exercise area.

Routt County Detention Facility
Steamboat Springs, CO

48-bed facility expandable to 52-bed including 3-level sheriff/detention offices.  Also includes full service kitchen, laundry, parking, vehicle sallyport, and extended roads.

Huerfano County Law Enforcement Center
Walsenburg, CO

28-bed facility expandable to 52-bed.  Includes law enforcement center and holding facilities, full service kitchen, laundry, parking, and extended roads.  Structure was built using masonry, structural steel, and pre-cast concrete.

Pitkin County Detention Facility
Aspen, CO

27-bed expandable to 54-bed detention facility.  Received AIA Merit Award in 1984.  Includes sheriff's office, gymnasium, exercise center, and vehicle sallyport.  Masonry, structural steel, and pre-cast concrete.

 back to top

County Facilities

Pitkin County Health and Human Services
Aspen, CO

Includes such offices as Senior Services, counseling and substance awareness programs, veteran's programs, Job Service, childcare, Community Health, mental Health, and Youth Coordinator.

Pitkin County Service Center
Aspen, CO

21,000 s.f.  Three metal buildings. Shop with lifts, maintenance, wash bay, heated storage

back to top 

Maintenance Facilities

Aspen City Shops Maintenance Facility
Aspen, CO

Three masonry buildings. Shop with lifts, maintenance, wash bay, heated storage

Hinsdale County Maintenance Facility
Hinsdale, CO

Shops for Hinsdale County Maintenance and storage of vehicles

Gunnison Service Center Maintenance Facility
Gunnison, CO

Metal building. City shops, maintenance, parts and service, wash bays

Denver Rio Grande, Railroad Auto Signal Shop
Denver, CO

Renovation for Denver Rio Grande Railroad. Shops, storage

Holy Cross Electric
Glenwood Springs, CO

Two level. Administration office, heated storage and wash bays

Telluride Bus Storage Maintenance Facility
Telluride, CO

Two masonry buildings. Heated storage, shop and maintenance

Munitions Training Facility
Lowry Air Force Base

New construction. Received 1985 "Contractor of the Year" award from COE

Mountain Parks Electric Association
Granby, CO

Design-Build. Offices and vehicle storage and maintenance

CDOT-Vehicle Maintenance Facility
Frisco, CO

14,260 s.f. metal building, includes seven work bays, office and storage.

Gilpin County Sand Storage Facility
Gilpin County, CO

Sand Storage Facility for Road and Bridge Department

back to top 

Educational and Community Buildings

Gilpin County Community Center
Gilpin County, CO

The Gilpin County Community Center was a 42,000 SF Design/Build project. Newstrom-Davis acted as Design/Build GC/CM overseeing all aspects of the project from design through pre-construction to value engineering and completion. The facility includes an aquatics center, gymnasium, raised running track, senior’s center, youth facility, wetcrafts room, lounges, locker rooms, and offices.

Cherry Creek Elementary Schools #33 & #34
Aurora, CO

Two new elementary schools, 50,000 square foot each.  Construction consists of steel frame and bearing masonry walls on concrete grade beams and caissons.  Site includes all underground utilities, curb, gutter, landscaping, decorative fencing, softball field, include backstops and play surface.

Thunder Ridge High School Addition & Renovation
Highlands Ranch, CO

32,368 square foot addition to an existing building.  The addition primarily incorporates classrooms and more specifically science laboratories, technical laboratories and computer labs.  The construction consists of structural steel, metal joists and deck and masonry.  The site work included grading, extension of utilities and construction of a tennis court, bleachers, a baseball field, dug out and warming track.

Colorado Mountain Colleges Dormitories
Glenwood Springs, Leadville and Steamboat Springs, CO

Three dormitory and Multi-Use facilities at 3 campus locations housing 684 students.  All constructed with Greenblock.

Aspen High School Addition & Remodel
Aspen, CO

Classroom addition and remodel of labs

Pikes Peak  Community College
Colorado Springs, CO

Student Center and Cafeteria at the Pikes Peak / El Paso Community College

Aspen Ice Rink
Aspen, CO

New Construction.  Community ice rink that can be used for art festivals and music performances during the summer months and convert to an ice skating rink in the winter.

Richardson Hall, Adams State College
Alamosa, CO

Remodel of Administration building, classroom and theater building.

Fiske Planetarium
CU, Boulder, CO

When the Fiske planetarium was constructed, it was one of a very few in the country. This facility received national recognition in several science publications.  The planetarium was designed with a geodesic dome which created a striking addition to the University of Colorado campus.  Construction is cast-in-place concrete.  The interior of the planetarium was designed as a teaching facility and to house the 40-foot telescope.

Clear Creek High School
Idaho Springs, CO

Every wall in this school is at a 22 degree angle to all connecting and adjacent walls.  The unique structure is somewhat of a landmark to those who travel on I-70 past Idaho Springs

back to top 

Multi-Unit Housing 

Bear Claw II Condominium
Steamboat Springs, CO

52 units within a seven-story structure at the top of the first ski lift.

The Ranch at Steamboat
Steamboat Springs, CO

New construction of 444,000 square feet in 148 living units.  Additional amenities include convention/recreation center.

Torian Plum
Steamboat Springs, CO

Renovation of garden wall area, including sidewalks, fascia and painting.  Installation of new deck drains, public bathrooms renovated to meet ADA standards.  Removal of soffits on all balconies and re-insulated top of walls to stop air infiltration.

Bronze Tree Condominiums
Steamboat Springs, CO

32 units, 6 story condominium project, cast in place concrete on masonry bearing walls.  Amenities include a swimming pool, hot tub and sauna.  Facility includes a two story underground, cast in place concrete, spiral parking lot.