Evans
Theater |
This
project consists of providing all labor, material and equipment to renovate interior
of Evans Theater to include the following: HVAC, repair/replace seating, bring
electrical and lighting system up to current code and repair interior. |
|
Staff
Judge Advocate Building 13 Renovation |
Remodel the existing facility to accommodate the Office of the Staff Judge Advocate: modify the interior layout to account for manpower, computers, network, printers, digital senders, fax machines, telephones and upgrade intercom/public address system. |
| back to top | |
| Leadership Development Building Buckley AFB, CO |
The Leadership Building at Buckley is a 16,000 sf multipurpose facility with seating capacity for 500 people. The building is used for instruction, meetings, and conferences. The exterior of the building was designed to blend and complement the existing architecture of the base. The building was constructed to be LEED Silver.![]() |
|
Sewer
Utilities Upgrade |
The
project included total design and construction including boring beneath
existing horizontal construction with significant vehicle and pedestrian
traffic. The project needed to be extensively phased to minimize the impact
to the base. |
|
Building
368 Renovation |
The project
included total design and construction of the area for use by the members of
the 15 MUNS. The base requirements for design and construction included the
renovation of a work area and the creation of a Munitions Control room placed
within a historical building. The integrity and character of the historical
building was to be maintained throughout the project. |
|
Penstocks
in Tunnels 1-8 |
Prep and Paint
Penstock Sections in Tunnels 1-8 |
|
Construct
Water Line Under I-90 |
The project
consisted of boring a 54" steel casing that will carry a new 16"
restrained joint PVC pipe. The project included valves, valve boxes, and
other appurtenances at various locations. Also included in the project was
removal and abandonment of existing water mains. The construction also
included connecting to existing water mains, parking lot repair, fence
removal and replacement, seeding and surface restoration. |
|
Install
HVAC Units in Dorms 130/131 |
Remove existing
HVAC units. Upgrade to new, more energy efficient units with multiple zones
to serve the needs of Dormitories 130/131. |
| back to top | |
|
Thermal
Energy Storage Test Facility—Steam Module, SolarTAC |
Design,
fabricate, and install a thermal energy storage test system to support the
development, testing and evaluation of novel thermal energy storage materials
and systems. Thermal energy will be supplied to candidate TES systems via an
independent loop: as high-temperature, high-pressure steam. The systems will
be able to thermally cycle a TES system under conditions that replicate a CSP
power plant. |
|
S&TF
PDIL Gas Line Upgrade & SERF HPM Gas Line Upgrade |
Remove and replace toxic gas line systems including
structural upgrades, Fire Detection/Alarm and Suppression, Hazardous
Production Materials (HPM) Gas Delivery System, Monitor Detect Alarm System, Work
included new acid and hydride monitoring points and tubing to existing MDA
room, and new electrical and mechanical service to HPM controls system |
| Windfarm Turbine Pad NREL Facility Boulder, CO |
Install new concrete pads and anchor bolts to support the installation of wind turbines with sizes varying from residential sizes to megawatt turbines.![]() |
|
Denver
West Parkway Addition |
This
project as part of the traffic mitigation measures added an additional right
turn lane from Denver West Parkway onto Denver West Marriott Blvd. The result
is increased out bound turn capacity from the South Table Mountain Campus
traveling eastbound. |
| Phelps County Justice Center Phelps County, NE |
Construction of a 31,000 square foot detention facility including commercial kitchen, offices, medical facility, and detaining areas; addition and remodel of the existing 1911 courthouse. The addition is constructed of Insulated Concrete Forms, masonry, and poured in place concrete with the requirement to match existing adjacent historical building’s architectural finishes. ![]() |
|
Bent
County Detention Facility |
Bent County Detention facility
includes a Jail, Sheriff's Department, Sheriff's Garage and Ambulance
Garage. First phase of building is designed for 38 inmates with expansion
capacity of up to 68 inmates on a second tier. The facility includes
offices and garages for the Sheriff's department. |
|
Teller
County Jail |
Initially a 58-bed jail facility
was expanded to 102-bed. Could be further expanded. The structure
was built utilizing masonry, cast-in-place concrete, structural steel, and
steel joist and deck. The facility includes full service kitchen,
laundry, offices, indoor/outdoor gymnasium, a library, and computer flooring
in the dispatch area. |
|
Gilpin
County Justice Center |
52,000 s.f. 58-bed detention
facility expandable to 112-bed. Includes full service kitchen, library,
laundry, and indoor/outdoor exercise facility. Justice Center includes
courts, social services, District Attorney's offices and sheriff's
facilities. |
|
Prowers
County Detention Facility/Sheriff Office |
New two story masonry facility and
the renovation of an existing facility to become the new sheriff's
office. 48-bed facility includes full service kitchen, laundry, crime
labs, juvenile holding facility, and large indoor/outdoor exercise area. |
|
Routt
County Detention Facility |
48-bed facility expandable to
52-bed including 3-level sheriff/detention offices. Also includes full
service kitchen, laundry, parking, vehicle sallyport, and extended roads. |
|
Huerfano
County Law Enforcement Center |
28-bed facility expandable to
52-bed. Includes law enforcement center and holding facilities, full
service kitchen, laundry, parking, and extended roads. Structure was
built using masonry, structural steel, and pre-cast concrete. |
|
Pitkin
County Detention Facility |
27-bed expandable to 54-bed
detention facility. Received AIA Merit Award in 1984. Includes sheriff's office, gymnasium, exercise
center, and vehicle sallyport. Masonry, structural steel, and pre-cast
concrete. |
|
Pitkin
County Health and Human Services |
Includes such offices as Senior
Services, counseling and substance awareness programs, veteran's programs,
Job Service, childcare, Community Health, mental Health, and Youth
Coordinator. |
|
Pitkin
County Service Center |
21,000 s.f. Three metal
buildings. Shop with lifts, maintenance, wash bay, heated storage |
|
Aspen
City Shops Maintenance Facility |
Three masonry buildings. Shop with
lifts, maintenance, wash bay, heated storage |
|
Hinsdale
County Maintenance Facility |
Shops for Hinsdale County
Maintenance and storage of vehicles |
|
Gunnison
Service Center Maintenance Facility |
Metal building. City shops,
maintenance, parts and service, wash bays |
|
Denver
Rio Grande, Railroad Auto Signal Shop |
Renovation for Denver Rio Grande
Railroad. Shops, storage |
|
Holy
Cross Electric |
Two level. Administration office,
heated storage and wash bays |
|
Telluride
Bus Storage Maintenance Facility |
Two masonry buildings. Heated
storage, shop and maintenance |
|
Munitions
Training Facility |
New construction. Received 1985
"Contractor of the Year" award from COE |
|
Mountain
Parks Electric Association |
Design-Build. Offices and vehicle
storage and maintenance |
|
CDOT-Vehicle
Maintenance Facility |
14,260 s.f. metal building,
includes seven work bays, office and storage. |
|
Gilpin
County Sand Storage Facility |
Sand Storage Facility for Road and
Bridge Department |
|
Gilpin
County Community Center |
The Gilpin County Community Center
was a 42,000 SF Design/Build project. Newstrom-Davis acted as Design/Build
GC/CM overseeing all aspects of the project from design through
pre-construction to value engineering and completion. The facility includes
an aquatics center, gymnasium, raised running track, senior’s center, youth
facility, wetcrafts room, lounges, locker rooms, and offices. |
|
Cherry
Creek Elementary Schools #33 & #34 |
Two new elementary schools, 50,000
square foot each. Construction consists of steel frame and bearing
masonry walls on concrete grade beams and caissons. Site includes all
underground utilities, curb, gutter, landscaping, decorative fencing,
softball field, include backstops and play surface. |
|
Thunder
Ridge High School Addition & Renovation |
32,368 square foot addition to an existing
building. The addition primarily incorporates classrooms and more
specifically science laboratories, technical laboratories and computer
labs. The construction consists of structural steel, metal joists and
deck and masonry. The site work included grading, extension of utilities and
construction of a tennis court, bleachers, a baseball field, dug out and
warming track. |
|
Colorado
Mountain Colleges Dormitories |
Three dormitory and Multi-Use
facilities at 3 campus locations housing 684 students. All constructed
with Greenblock. |
|
Aspen
High School Addition & Remodel |
Classroom addition and remodel of
labs |
|
Pikes
Peak Community College |
Student Center and Cafeteria at
the Pikes Peak / El Paso Community College |
|
Aspen
Ice Rink |
New Construction. Community
ice rink that can be used for art festivals and music performances during the
summer months and convert to an ice skating rink in the winter. |
|
Richardson
Hall, Adams State College |
Remodel of Administration
building, classroom and theater building. |
|
Fiske
Planetarium |
When the Fiske planetarium was
constructed, it was one of a very few in the country. This facility received
national recognition in several science publications. The planetarium
was designed with a geodesic dome which created a striking addition to the University
of Colorado campus. Construction is cast-in-place concrete. The
interior of the planetarium was designed as a teaching facility and to house
the 40-foot telescope. |
|
Clear
Creek High School |
Every wall in this school is at a
22 degree angle to all connecting and adjacent walls. The unique
structure is somewhat of a landmark to those who travel on I-70 past Idaho
Springs |
|
Bear
Claw II Condominium |
52 units within a seven-story
structure at the top of the first ski lift. |
|
The
Ranch at Steamboat |
New construction of 444,000 square
feet in 148 living units. Additional amenities include
convention/recreation center. |
|
Torian
Plum |
Renovation of garden wall area,
including sidewalks, fascia and painting. Installation of new deck
drains, public bathrooms renovated to meet ADA standards. Removal of
soffits on all balconies and re-insulated top of walls to stop air
infiltration. |
|
Bronze
Tree Condominiums |
32 units, 6 story condominium
project, cast in place concrete on masonry bearing walls. Amenities
include a swimming pool, hot tub and sauna. Facility includes a two
story underground, cast in place concrete, spiral parking lot. |